General Overview
This site happens to be our "long-term" research site. We'll use this page to post interesting photos etc dealing specifically with the hospital.
|
Oklahoma Abandoned Hospital Preliminary Investigation
Lead Investigators: Ron and Becky Team Leaders: Ron, Denny & Jeff Weather: Overcast with periodic rain, 65 73 degrees F, up to 100% Humidity Type: Indoor Investigation Equipment: 2 Gauss Master Analog EMF Detectors
An Oklahoma City Ghost Club Member had been in this building on a previous occasion independently and pointed this spot out to the club as a great place to conduct an investigation. Locals in the area claim this 6 story Abandoned Hospital is haunted. Due to the fact that it is vacant and is a favorite for teens, we decided to conduct a preliminary investigation. With a total of 15 Club Members including 3 Team Leaders we broke into three separate teams. This investigation was conducted with 2 sweeps per floor. After the initial sweep the teams rotated, so that a different team conducted the second sweep for a comparison of data. Each team leader prepared a report noting their teams activities, which I have attached to this report. This report is an overall summary of anomalies noted. Level 1 Basement Team 1 Ron Room B20 including the Hallway had spikes on the Tri-Field of 2 3, but had no temperature change or any pictures with anomalies. Emergency Room had EMF spikes of 1 3 7. Team 2 Jeff Emergency Room had a temperature increase that went from 25 to 28 degrees Centigrade and an EMF reading from 0 6. Kitchen Area had a temperature increase from 25 40 degrees Centigrade. Room B14 had a temperature increase from 24 26 degrees Centigrade. Room B01 had a temperature increase from 26 29 degrees Centigrade. Level 2 1st Floor Team 1 Room 102 had EMF spikes of 1 3 4 5 7 that lasted 3 4 minutes, they did obtain photos with unexplainable anomalies. There were no temperature changes. Room 137 had EMF spikes of 2 3 lasting 2 3 minutes; they also obtained photos during this anomaly. Again no temperature changes. Team 2 Room 104 had temperature decrease from 27 24 degrees Centigrade. Room 118 had temperature increase from 24 27 degrees Centigrade. Room (U/A) had temperature increase from 25 28 degrees Centigrade. Room 132 had EMF spike from 1 2 Room 166 had temperature increase from 25 29 degrees Centigrade. Level 3 2nd Floor Team 1 Jeff Room 208 had a temperature increase from 26 27 degrees Centigrade and an EMF spike to 4. Room 209 had an EMF spike to 4. Room 217 had a temperature increase from 26 29 degrees Centigrade. Room 207 had a temperature increase from 27 29 degrees Centigrade Room (U/A) had a temperature increase from 26 27 degrees Centigrade and EMF spike of 2 3. Team 2 Denny Room 207 had and EMF spike from 0 1.6 in the middle of the room. Level 4 3rd Floor Team 1 Room 300 had temperature increase from 22 30 degrees Centigrade. Team 2 No anomalies noted by team. Level 5 4th Floor Team 1 - Denny Room 500 had EMF spike in hallway of 2.1 Team 2 Ron No anomalies noted by team. Level 6 5th Floor Team 1 No anomalies noted by team. Team 2 No anomaly notes other than the 2 team members feeling dizzy and lightheaded in the last room of the far east end. With the pictures that have developed from Level 2 1st Floor and a initial EVP ran on this Level with an unusual noise, it is the conclusion of the Team Leaders and Lead Investigators that this building should have a follow-up investigation. Other Investigator ReportsJeff's Report Denny's report |
EVPsSome of the few evps ever obtained on this site, for more details visit the EVP page.
|